Simulation of Sychronising a Generator to the electrical grid (NEW version 3.0.1. released on 28 Nov 2025 – Try it now!).
The aim is to synchronise the turbine/generator to the 50Hz grid with the minimal disturbance to the machine or the grid system. The key to receiving a good score is to ensure the voltage, freqency and phase angle of the incoming machine is equal to the voltage, frequency and phase angle of the electrical grid at the moment the CB (circuit breaker) is closed. To achieve a perfect score of 100% may require a few attempts.
Minimum System requirements macOS are;
- Intel or ARM processor
- macOS 10.14 (Mojave)
- Current release version is SyncSIM v3.0.1
Download – SyncSIM for macOS.PKG v3.0.1 32.50 MB
Minimum System requirements Windows are;
- Windows 10 (build 1903+) or Windows 11
- Current release version is SyncSIM v3.0.1
Download – SyncSIM for Windows.EXE v3.0.1 42.78 MB
Other related files;
SyncSIM user manual.PDF 7.60 MB
Please find a screenshots below.

And a how-to video.